Located at the edge of the latest expansion of the urban city of A Coruna, to the South, the field office of the Park comprises an area of 39.44 hectares, separated by a stretch of railway track of the new residential estate contact the area with the Avda. Alfonso Molina, set to fast-track connection with the city, and proximity to the junction with Highway link the Atlantic provide the necessary environment to its ease of access, minimizing the times of travel to the urban area.
Develop its functional requirements is a large square representative, taking advantage of a favorable topographical configuration as a central, welcoming the area beneath a large car park and setting the upper level of the plaza buildings tertiary low-nine plants in the little area call that office. This area, tied to the great underground parking lot that one proposes in the zone, combines a mixed traffic of vehicles and pedestrians through the project of an underground road through the area incorporated into the parking lot, while on the surface are available only pedestrian zones.
On the residential land are two types: closed or open the rooms and the linear block. The building blocks of moderate height reflects the significant residential use assigned to the area, with a sort of open, in which green spaces are integrated with the building. The residential development contains 50% of homes for protection, which are located in two areas apparent.
Efforts were made to the heights that are projected to maintain an appropriate scale with the open spaces, play areas or places, and to ensure a quality environment, which is achieved with a maximum height of B +6, +5 B and B plants +4. In the areas adjacent to the rural population (Elviña and Eiris) was managed heights-pendulum between B +1, B +2 and B +3 floors.
The land allocated to schools located in the area of contact with Alfonso Molina, in both margins, while the new route parallel to the road of Eiris, sets out the plots of equipment for services of public interest and social. The zones are situated close to sporting equipment such as soil for park or green area, and the equipment of a commercial nature are linked to the low of residential buildings.
Park office management tries to project a volume that takes into account the relationship between the built environment and free space in an attempt to achieve a higher quality of urban environment, where they coexists parks, squares and buildings in a more chord, by its dimensions in plan and elevation.
Surface area: 346.418 m2
Intensity of use overall: 1,10 m2/m2
Residential use, distribution between:
Housing protection (VP): 142.897 m2 VP (50%)
V.P. m2 commercial (low): 23.690 m2
V.P. m2 residential: 119.207 m2
Number of modules (100 m2) houses V.P.: 1.192
Free housing (VL): 142.897 m2 VL (50%)
V.L. m2 commercial (low): 20.122 m2
V.L. m2 residential: 122.775 m2
Number of modules (100 m2) V.L. homes: 1.228
Total housing No: 2.420 homes
Harnessing tertiary use: 95,265 m2 const.

Uso terciario (azul), residencial (gris: oscuro corresponde a vivenda de protección)

Espacios libres

Equipamentos
HOUSES FOR SALE. ENTRIES IN THE SINGLE RECORD OF Plaintiffs:
- Single Registration of applicants for Housing Protected
- Rental Housing Program

Á venda parcela de uso comercial na urbanización "
in: Anuncio Venda de Parcelas...
Adxudicacion Provisional Control Calidade obras Ur
in: Adxudicación Provisional...
Adxudicacion Provisional Contratacion Control Cali
in: Adxudicación Provisional...
Xestión Urbanística de A Coruña S.A.